Case Study

property image property image property image

Park Gate W5 – Transformation & Modernisation

Client Background

Having collaborated with our overseas client for over a decade, we were entrusted once more, this time for another flat in their expansive London property portfolio.

Challenge

A 1960s terraced townhouse, nestled in a charming Ealing cul-de-sac, had started to show its age and required modern interventions.

 

Back to Case Studies Contact Us

Project Objectives

  1. Electrical Overhaul: Update wiring throughout the property, ensuring a safer and more streamlined appearance.
  2. Kitchen Redesign: Optimise the compact space for better functionality.
  3. Bathroom Modification: Modernise fittings and create a spacious shower area.
  4. Garden Transformation: Landscape the rear garden to enhance outdoor appeal.
  5. Interior Upgrade: Uncover and restore the original parquet floor and introduce neutral tones for a contemporary feel.
  6. Property Management: Provide consistent and regular updates to our client on the state and management of the property.

Solutions Implemented

1. Wiring Update:

Undertook comprehensive rewiring, placing light fittings and sockets strategically.

2. Kitchen Optimisation:

Removed one of the two doors to maximise usable space.

3. Bathroom Refurbishment:

Updated bathroom and cloakroom fittings, repurposing an area for a spacious shower.

4. Garden Revamp:

Landscaped the rear garden, turning it into a relaxing oasis.

5. Floor and Decor:

Revealed and rejuvenated the original parquet floor on the first floor and transformed dark-stained wood elements with fresh white paint. Further, new window coverings and light fittings added vibrancy.

Results and Achievements

The property was successfully transformed into a modern, functional space that now appeals to young families and professionals working from home. With Chambré overseeing the letting and management, our client remains well-informed through consistent updates and statements, ensuring peace of mind.